Excavation and Driveway Permits
Excavation and Driveway Permits
In order to do any work within the Town of Windsor right-of-way (i.e. connecting a driveway to the street, crossing a town sidewalk with a drive, or any excavation in the right-of-way) one must first obtain a Contractor's license with the Town of Windsor Engineering Department. No permit to work can be issued until this is completed.
Forms
Issuing of Licenses
Before a new license can be issued a contractor must provide a bond on the Town of Windsor form in the amount of $10,000, a certificate of insurance for $1,000,000, and a minimum of 2 references of previous work performed. (*See Below)
For license RENEWALS the contractors insurance and bond must be valid and on file.
* Projects completed in the past 2 years involving the type of work for which the license is applied for, and minimum of 2 references familiar with the type of work for which the license is being requested.
Types of Licenses
- Curb & Walk
- Drain, Pipe, or Conduit Layer
- Street Excavation / Driveway
- General Contractor (e.g., Curb, Walk, Drains, Driveways, & Excavation)
License Fees
New License Issue $75.00
Renewal of License $50.00
One fee covers any and/or all licenses
Procedure to Issue Permits
Every Contractor doing business in the Town is required to have the following before a permit can be issued.
- A License issued by the Town for the calendar year
- A Bond on the Town form in the amount of $10,000
- A Certificate of Insurance for $1,000,000
- "Call Before You Dig" request number
Permit fees for work performed within town's right of way
| Driveways/curb cuts | $25.00 |
| Town Sidewalk (Driveway crossing) | $50.00 |
| Excavations (in Town R.O.W.) | $50.00 |
|
Additional Charge Per Excavation:
|
$25.00 |
| Penalty fee for excavation of street resurfaced or reconstructed within three years of permit application |
10x permit fee; minimum of $250 |
List of streets resurfaced in the last 3 years
| 2009 CONSTRUCTION SEASON |
| Day Hill Road (Alstom west drive to Route 187) |
| Deerfield Road (Route 218 to I-291 On-Ramp) |
| Graham Road |
| Lang Road |
| Matianuck Avenue (Robin Rd to Sunnyside Cir) |
| Matianuck Avenue (Rood Ave to West Wolcott) |
| Michael Lane |
| Poplar Drive |
| River Street (Rockybrook to Old River St) |
| Stone Road (690'N of International Dr to Town line) |
| Timber Lane |
| Timothy Terrace |
| Walnut Drive (Hemlock Rd to 72 Walnut Dr) |
| 2010 CONSTRUCTION SEASON |
| Donna Lane |
| Ford Road |
| Hale Drive |
| Matianuck Avenue (Donna Ln to Hale Dr) |
| Matianuck Avenue (Lee Ln to 227 Matianuck) |
| Philip Henry Circle |
| River Street (Kennedy Rd to 100' W of Hayden Station Rd) |
| River Street (Route 75 to River Street Park) |
| Rood Avenue (Green Manor to Shelly Ave) |
| Windbrook Drive |
| 2011 CONSTRUCTION SEASON |
| Day Hill Road (WB-Spencer Turbine to Old Iron Ore) |
| Day Hill Road (EB-Lamberton Rd to Route 75) |
| Kellogg Street (Lenox to Preston) |
| Matianuck Avenue (Sunnyside Circle to Windbrook Ave) |
| Robin Road (Matianuck Ave to Sunnyfield Dr) |
| Stone Road (Rainbow Rd to Winterwood) |
| Sunnyfield Drive (Park Ave to Shelley Ave) |
| Sunnyside Circle (Park Ave to Matianuck Ave) |
| West Ridge (Columbia Rd to cul-de-sac) |