Excavation and Driveway Permits

Excavation and Driveway Permits

In order to do any work within the Town of Windsor right-of-way (i.e. connecting a driveway to the street, crossing a town sidewalk with a drive, or any excavation in the right-of-way) one must first obtain a Contractor's license with the Town of Windsor Engineering Department. No permit to work can be issued until this is completed.

Forms

  • Permit Application:      Word | PDF
  • Bond Form:                Word | PDF
  • Request for License:    Word | PDF

Issuing of Licenses

Before a new license can be issued a contractor must provide a bond on the Town of Windsor form in the amount of $10,000, a certificate of insurance for $1,000,000, and a minimum of 2 references of previous work performed. (*See Below)

For license RENEWALS the contractors insurance and bond must be valid and on file.

 

* Projects completed in the past 2 years involving the type of work for which the license is applied for, and minimum of 2 references familiar with the type of work for which the license is being requested.

Types of Licenses

  • Curb & Walk
  • Drain, Pipe, or Conduit Layer
  • Street Excavation / Driveway
  • General Contractor (e.g., Curb, Walk, Drains, Driveways, & Excavation)

License Fees

New License Issue                  $75.00

Renewal of License                 $50.00

One fee covers any and/or all licenses

Procedure to Issue Permits

Every Contractor doing business in the Town is required to have the following before a permit can be issued.

  • A License issued by the Town for the calendar year
  • A Bond on the Town form in the amount of $10,000
  • A Certificate of Insurance for $1,000,000
  • "Call Before You Dig" request number

Permit fees for work performed within town's right of way

Driveways/curb cuts $25.00
Town Sidewalk (Driveway crossing) $50.00
Excavations (in Town R.O.W.) $50.00

Additional Charge Per Excavation:

  • adjacent locations at the same property
  • each 50 feet of main line construction
$25.00
Penalty fee for excavation of street resurfaced or reconstructed
within three years of permit application
10x permit fee; minimum of $250

 

List of streets resurfaced in the last 3 years

2009 CONSTRUCTION SEASON
Day Hill Road (Alstom west drive to Route 187)
Deerfield Road (Route 218 to I-291 On-Ramp)
Graham Road
Lang Road
Matianuck Avenue (Robin Rd to Sunnyside Cir)
Matianuck Avenue (Rood Ave to West Wolcott)
Michael Lane
Poplar Drive
River Street (Rockybrook to Old River St)
Stone Road (690'N of International Dr to Town line)
Timber Lane
Timothy Terrace
Walnut Drive (Hemlock Rd to 72 Walnut Dr)
2010 CONSTRUCTION SEASON
Donna Lane
Ford Road
Hale Drive
Matianuck Avenue (Donna Ln to Hale Dr)
Matianuck Avenue (Lee Ln to 227 Matianuck)
Philip Henry Circle
River Street (Kennedy Rd to 100' W of Hayden Station Rd)
River Street (Route 75 to River Street Park)
Rood Avenue (Green Manor to Shelly Ave)
Windbrook Drive
2011 CONSTRUCTION SEASON
Day Hill Road (WB-Spencer Turbine to Old Iron Ore)
Day Hill Road (EB-Lamberton Rd to Route 75)
Kellogg Street (Lenox to Preston)
Matianuck Avenue (Sunnyside Circle to Windbrook Ave)
Robin Road (Matianuck Ave to Sunnyfield Dr)
Stone Road (Rainbow Rd to Winterwood)
Sunnyfield Drive (Park Ave to Shelley Ave) 
Sunnyside Circle (Park Ave to Matianuck Ave)
West Ridge (Columbia Rd to cul-de-sac)