2024 Milling and Paving Program

The Engineering Department is finalizing our milling and paving list for 2024. Notices will be sent to the residents of the affected roads in advance of any work being performed.

Baker Hollow Road Reconstruction

Baker Hollow Road, spanning from Old Poquonock Road to Marshall Phelps Road is undergoing full depth reconstruction of the roadway as well as the installation of water and sewer services. Construction has started on this project. Detour signs have been posted by the contractor.

International Drive Southbound Lanes – Reconstruction

Reconstruction of the Southbound Lanes of International Drive, spanning from Rainbow Road to the East Granby town line, will being taking place in 2024. The start date will be posted as the Town proceeds with this project.

Wilson Gateway Park

The Town is awaiting bids for proposals for the construction of the Wilson Gateway Park off of Windsor Avenue. There is no timetable for a construction start at this time.

Broad Street Road Diet

The Town is currently working with a qualified engineering firm on a design for a “road diet” of Broad Street. Click HERE for more information.